Guarantees are provided for all types of work, as we are confident in the quality of services provided.
Yes, minimum 3:12 pitch; low-slope systems with raised seams.
Remove paint or acid-etch/sandblast; bonding agent required for adhesion.
Wire brush, rust converter, prime/paint; replace if perforated.
Vertical preferred for fewer seams; horizontal ok on tall walls but more taping labor.
Replace section (vinyl easier to cut/splice); brittle from UV—upgrade to metal.
Spray for speed/even coverage on large areas, back-roll immediately; brush/roller trim/details.
Yes—reflect up to 70% solar heat, reducing cooling costs by 20-30%; cool roof coatings available.
No subcontractors—your crew is consistent start to finish.
Yes—prevent clogs (leaf screens $1.50-25/ft, foam $2-3/ft, micro-mesh $8-25/ft); pay for self in reduced cleaning.
Optional but recommended every 5-10 years; elastomeric paint best for breathability/moisture protection.
Yes—self-regulating cables in cold climates ($10-20/ft installed); integrate during new install.
Minor shingle repairs: $150-500; leak fixes: $300-1,000; flashing repair: $200-800; full section replacement: $1,000-3,000. Varies by material, size, accessibility.
Install corner miters or adjustable miters, screw/seal securely.
Trim trees, clean gutters seasonally, remove debris, inspect after storms. Avoid pressure washing shingles.
Yes for storm/tree fall (not neglect/clogs); document for claims.
Remove broken sections, check for rot in fascia/soffit, heat tape prevention.
Yes, often—saves time/cost if existing roof is sound, but tear-off preferred for optimal performance and warranty.
Hail/wind damage often yes (replacement cost value); wear/tear no. Document storm damage for claims.
Chip out loose material, clean, apply bonding agent, patch with matching stucco, texture to blend.
Yes—light colors (white/light gray) reflect heat (cool roofs); dark absorb. Energy Star-rated shingles available.
Roofing hammer, pry bar, utility knife, caulk gun, cement, replacement shingles, ladder, safety harness.
Metal strips seal roof-wall/chimney/skylight joints against water. Poor flashing causes 80% leaks.
1 per 40-50 ft gutter; corners get extras; 2x3" residential standard.
Experienced crews use tarps, phased work, valleys shielded first. Delays possible; contracts include weather clauses.
Normal aging from rain/foot traffic; excessive means UV degradation—monitor, repair bald spots promptly.
1-3 years workmanship; paint manufacturer defects 10-25 years.
Annual inspections, gutter guards, tree trimming, heat cables in freeze areas.
Faulty flashing (80% of cases), cracked/missing shingles, clogged valleys, ice dams, poor ventilation leading to condensation.
Optional—hire designer or use store tools; confirm before ordering paint.
$4-40 per linear foot installed; aluminum $8-28, copper $25-74; average home (200 ft) $1,000-5,000 total including labor. modernize
Marginal ROI (50-70%); appeals for curb appeal, protects foundation/siding.
Spring-fall (50-85°F, low humidity); avoid rain/ extreme heat/cold.
Remove old gutters, fascia repair, clean soffits, measure precisely for seamless machine.
Many contractors offer 0% financing, loans, or manufacturer programs. Check energy rebates for efficient materials.
Premium 100% acrylic latex (Sherwin-Williams Duration/Everlast, Benjamin Moore Aura); durable, mildew-resistant, self-priming for exteriors.
Scratch/brown: 3/8" each; finish: 1/8"; total base 3/4" over lath.
Too much mud under tape, poor adhesion, or fast drying—use thin mud layer, press firmly.
Ground-level trim allowing water drainage from wall cavity; required by code at foundation line.
Workmanship 1-5 years; materials match roof type; full replacement often better long-term value.
Missing, cracked, or curling shingles; granule loss in gutters; leaks or stains inside; sagging areas; damaged flashing around chimneys/skylights.
Paper stronger for high-stress joints; mesh faster for setting compounds, less cracking.
1-3 days for average home; depends on complexity, crew size, roof pitch.
Aluminum lighter/cheaper, rust-proof; steel stronger but heavier, needs painting eventually.
Rubberized asphalt membrane applied under shingles at eaves, valleys, penetrations for leak protection against ice dams, wind-driven rain. Required in many codes.
Storm/tree damage yes; neglect/wear no; document with photos.
Material warranties: 20-50 years (pro-rated); workmanship: 5-10 years from installer. Full system warranties require certified installers (e.g., GAF, Owens Corning).
Tarp areas, pause/resume when dry; contracts include weather delays.
Yes—K-style (angular) or half-round (semicircle) to complement architecture; size 5" or 6" based on rainfall/roof size.
Measure length x width x height/8 (4x8 sheets); add 10-15% waste; ceiling separate.
Yes—increasingly for steep/safe assessment; provides photos/videos for accurate quoting.
Yes, up to 1/8" per 10 ft; panels designed with slots for movement.
Averages $8,000-$20,000 for asphalt shingles ($5-10/sq ft installed); metal $10-25/sq ft; tile $15-30/sq ft. Factors: size, pitch, materials, location, removal fees. Get multiple quotes.
Tarps over landscaping, magnetic nail sweepers for debris, dumpster on-site, worker safety gear. Ice/water shield along eaves/valleys prevents leaks.
Pasadena ZIPs and neighborhoods, plus South Pasadena, Glendale, Eagle Rock, and Greater Los Angeles.
Durable panels made from steel, aluminum, or copper formed into profiles like standing seam or corrugated, offering 40-70+ year lifespans with low maintenance.
Patch with flex tape or metal flashing sealed; cut out bad section and splice new for larger holes.
$8-20 per sq ft installed; premium standing seam higher, but long-term savings from durability/energy efficiency.
30+ standard Kynar colors; custom matches possible for HOA/architectural needs.
Asphalt shingles or clay tiles work best for local sun, rain, and wind; they recommend based on your home's style and budget during consultation.
Micro-mesh/SS screens for debris-heavy areas; foam inserts cheap but clog; surface tension best flow.
1. Meet to ascertain requirements. 2. Create detailed game plan with charges and materials. 3. Complete the job with designated contact throughout.
Same-day appointments available; quick turnaround for inspections and quotes with photos/videos.
Finish coat applied with trowel, sponge, or spray; knockdown, lace, swirl patterns common.
Scoop by hand/roach rod, flush with hose/gutter vacuum; install guards long-term.
Nibblers, shears, or circular saw with metal blade; avoid torches/grinders (sparks).
Exterior: satin/semi-gloss (washable); interior walls: eggshell/satin; trim: semi-gloss.
Measure/mark, cut outline with utility knife on front, punch out paper backing with drywall saw.
Minimal—ladders/scaffolding footprint; pros use drop cloths, hand-carry sections.
No, but provide access; exterior ok unsupervised if prepped.
Yes, fully licensed (CSL #1079589) and insured; Bryan has 25+ years experience.
1/4-1/2" drop per 10 ft toward downspouts; level checks during hang.
Material: 30-40 years non-perforation; finish: 30-40 years fade/chalk; workmanship: 5-20 years.
2 coats standard (prime + finish); 3 for drastic color changes or heavy stains.
Minor shingle patches yes if experienced; anything involving leaks, valleys, or steep pitches—no, hire pros to avoid safety risks and further damage.
20-30% deposit, progress payments, final on completion—no full upfront.
Sagging sections, leaks at seams, standing water, plants growing, peeling fascia paint, soil erosion at foundation.
Install ice/water shield full length, weave new shingles or add metal flashing; clean debris regularly.
Minimal: annual hose-down, clear debris/gutters, inspect fasteners every 5-10 years.
DIY sectional possible (<100 ft); seamless requires truck/machine—hire pros.
Clear walls/trim, move furniture, unplug electronics, cover fish tanks/plants.
Heat with torch (metal only), push into shape, reinforce with braces.
Yes—kills shingles; clean with bleach solution, repair slipped areas, install zinc strips for prevention.
Walls: 1/2"; ceilings: 5/8" for sag resistance; garages/fire-rated use 5/8" Type X everywhere.
Possible for asphalt shingles up to 2 layers in some areas, but full tear-off is recommended to inspect decking, improve drainage, and ensure longevity. Check local codes.
Run hose end-to-end, watch flow speed/ponding; adjust hangers as needed.
Stabilize base, use standoff, tie off, 2-person for high work; hire pros over 1-story.
Inspect annually for cracks, clean with low-pressure wash, re-caulk joints every 5 years.
Check slope (1/4"/10ft), enlarge downspouts, add leaders, trim trees; clean debris first.
Replace hidden hangers under shingles, spike into fascia/rafters not just siding.
Excellent—sheds snow easily due to slick surface; standing seam ideal for cold climates.
House settling, ice expansion, poor initial install; new hangers/spikes into rafter tails.
Type X with fiberglass; 5/8" single layer 1-hour walls; layered for apartments.
Minimal; thicker gauges (26-29) resist; impact-resistant options available.
1-4 hours minor; full day extensive; weather dependent.
Not recommended—dangerous, voids warranties, code violations. Hire licensed pros.
Every 144 sq ft max; cut through all coats, embed in sealant to allow movement.
$7-15/sq ft installed; traditional cement higher than synthetic one-coat systems.
Aluminum (light, affordable); steel (durable); copper (premium, patinas); vinyl (cheap but brittle); seamless preferred over sectional.
2-4x/year; guards reduce to 1x; check after storms.
Coarse for wood studs; fine for metal studs; #6 x 1-1/4" standard.
3 coats minimum: tape embed, fill, skim; Level 4 = 3 coats tapered joints.
After storms causing visible damage, active leaks during rain, fallen branches, or holes—tarps provide temporary protection but pros needed ASAP.
Age, poor ventilation, thermal expansion, moisture trapped under shingles—repair by replacing affected section, improving attic airflow.
Usually no, but check local codes for multi-story or drainage changes affecting neighbors.
Drop cloths/plastic sheeting, mask vents/fixtures, move/ cover furniture.
50-100 years with proper install/maintenance; cracks normal, repair promptly.
$2,000-$6,000 average for exterior (1,500 sq ft, 2-story); $1.50-4/sq ft interior. Factors: size, prep work, paint quality, location, access.
No—wet conditions prevent proper sealing; schedule dry weather or use temporary tarps.
Minor ok if not frozen; prolonged saturation causes efflorescence/softness—allow redry.
Twice yearly + after major storms; check from ladder/ground for debris, damage, soft spots.
Install weather-resistant barrier (2 layers building paper), metal lath stapled every 6", weep screed at base, trim accessories.
Wait 24-72 hours for sealants/adhesives to set. Avoid until contractor approves.
Edges: 8"; field: 12-16" on ceilings, 16" on walls; countersink slightly below surface.
25-95% recycled content; fully recyclable at end-of-life; reduces landfill waste.
Structural issue—don't repair surface; call for full assessment/possible replacement to avoid collapse.
Dumpster/magnetic sweep on-site; recycled where possible (shingles 60% recyclable). Contractor handles haul-away per local regs.
Prevents rapid drying/cracking; light water mist 24-48 hours per base coat.
Yes for storm/wind/hail damage (not wear/tear); document thoroughly with photos for claims; deductibles apply.
Ridge/soffit vents for airflow (1:150 ratio net free area). Prevents moisture/heat buildup; critical for asphalt shingles.
Resilient channels, double layers, Green Glue damping compound between sheets.
Yes—most premium paints qualify; check labels for certifications.
Loose brackets or thermal expansion; add straps, slip joints for movement.
Yes, Class A non-combustible; 1-hour rating typical for 7/8" system.
Repair if under 15 years old with isolated damage; replace if over 20 years, multiple issues, or granule loss everywhere. Inspection needed.
Install fascia brackets or wood blocking first for hanger support.
Remove or score/perforate, prime, test adhesion first.
Yes, two-coat system: dampen surface, apply brown coat directly (skip scratch), then finish coat.
Class A fire-rated; non-combustible metal won't fuel spread.
Look for curled/missing shingles, granule loss in gutters, interior leaks or stains, sagging roof deck, or age (20-30 years for asphalt shingles). Get a professional inspection before visible ceiling damage.
Licensing/insurance proof, references, warranty details, debris protection plan, material samples, timeline, payment schedule (no full upfront).
Bruises/dents on shingles/asphalt; soft spots; get adjuster inspection for insurance claim.
Perimeter of roof edges minus gables; add 10% waste; measure each run separately.
No, when properly installed over solid decking with insulation; sound is comparable to asphalt shingles.
No—above 40°F; protect from freezing, use anti-freeze admixtures if needed.
Custom flashing/step curbs needed. Contractor sketches/shows photos of handling penetrations.
You’ll always know what you are paying for. Your estimate shows the cost of all work, without hidden fees.
Full—remove tape/drops, sweep/vacuum, final walk-through.
$150-500 minor fixes (seals, hangers); $300-1,000 section replacement; full run $500-2,000 depending on material/access.
Aluminum 20-30 years; copper 50-100+; regular cleaning extends life.
Yes for simple sealants, loose hangers, downspout clogs; hire pros for sagging, large holes, or multi-story.
Full house: 1-2 weeks depending on size, weather; each coat needs 24-48 hours cure time with misting.
A standard residential roof installation typically takes 1-2 days, depending on roof size, material type, weather, and whether old materials need removal. Complex roofs or steep pitches may extend to 3-5 days.
Yes, but pitch matters (1/4" per 10 ft fall); low-slope needs larger/heated systems.
Yes, but use walk pads during install; avoid during heat expansion.
Quality job: 7-10 years exterior, 5-7 interior; depends on exposure/prep.
Trim trees, clean gutters quarterly, ensure ventilation, annual pro inspection, ice/water shield in key areas.
3-tab (basic, 20 years), architectural/laminated (thicker, 30-50 years, impact-resistant options). Match home style.
Power wash, scrape loose paint, sand, patch holes/cracks, prime bare spots, mask/tape.
Annually + after major storms. Check shingles, flashing, gutters, attic for issues.
Bathrooms, kitchens, laundry—greenboard or cement board; not showers (use tile backer).
Galvalume/steel coated with Kynar 500 paint lasts 40-60 years; regular cleaning prevents issues.
Yes, like any roof; local codes dictate pitch, fasteners, ventilation.
Spring/fall—avoid frozen ground or leaf season; dry weather ideal.
5" for homes <40' wide; 6" or 7" for larger roofs/heavy rain; calculate roof sq ft x rainfall factor.
Clean area, apply gutter sealant (silicone or butyl rubber), clamp overnight; replace if corroded.
Poor mix/water ratio, fast drying, no control joints, substrate movement, inadequate lath attachment.
Asphalt shingles (affordable, 20-30 years), metal (50+ years, energy-efficient), tile/clay (50+ years, fire-resistant), or slate (75+ years, premium). Depends on climate, style, budget, and HOA rules.
Yes—windows, doors, siding joints with elastomeric sealant to prevent water intrusion.
No fixed-price quotes; change orders signed/approved before extra work.
Yes, most areas require building permits for full replacements to ensure code compliance. Your contractor handles this; verify with local building department.
Extend downspouts 5-10ft from house, splash blocks, French drain if pooling.
Yes—seal paper texture, uniform paint absorption; use drywall primer or PVA.
Exterior first (messy ladders); interior anytime.
Wet sanding with sponge, purple sanding screens, vacuum attachments, dustless sander.
With quality coating and prep, 50 years or more is common.
Boosts value 6-7%; appeals to eco-conscious buyers with longevity claims.
T-braces (2x4s), deadman (plywood triangle), helper, or French cleats.
Traditional: cement-based 3-coat (heavier, more durable); synthetic: acrylic one-coat (lighter, flexible, faster).
1-2 days for average home; complex roofs/multi-story add time for measuring, cutting, hanging.
Metal strips sealing joints—repair by cleaning, applying cement/sealant, or replacing corroded pieces with new pre-formed flashing.
Prep deck, underlayment, drip edge, panels overlapped/secured with screws, flashing/ridge cap.
Simple shingle fix: 1-2 hours; leak repair: half day; extensive storm damage: 1-3 days depending on scope and weather.
Loose/missing hangers, thermal expansion, ice weight overload; re-secure or add brackets every 2 ft.
No, if properly installed with solid sheathing and insulation. Standing seam preferred over corrugated for quieter performance.
#10-14 wood screws with neoprene washers; never nails—thermal movement loosens.
Drywall repair/installation/finishing, stucco repair/installation/restucco, interior/exterior painting.
Reconnect with sleeves/cement, replace elbows, secure straps; extend buried sections.
Smoothest finish with 3-4 thin skim coats over entire surface; required for flat paint or glossy finishes.
Gutter-specific polyurethane or butyl caulk; flexible, waterproof, paintable.
Spray orange peel/knockdown with hopper gun, hand texture with slap brush/sponge.
Slide new shingle under overlying one, nail 1-1.25" above sealant strip, seal edges with roofing cement matching color/texture.
Standing seam: clips hidden, sleeker, better wind uplift; exposed: cheaper, faster DIY install.
Drywall (gypsum board) is a panel made of gypsum plaster pressed between paper layers, used to create interior walls/ceilings quickly and smoothly for painting.
Caused by thermal movement—pull nails, add roofing cement, renail higher up into solid decking with ring-shank nails.
Sample from house, mix custom batch, spray/trowel same technique; test patch first.
Settling, poor taping, humidity changes, no back-blocking on edges.
R-value ~1-2 per inch; EIFS systems higher with foam insulation backing.
Interior room: 2-4 days; full exterior: 3-7 days depending on size/prep/weather.
Materials 20-50 years; labor 1-5 years; manufacturer prorated for perforations.
Seamless custom-formed on-site (leak-proof, cleaner look, $6-28/ft); sectional pre-made joints ($3-20/ft, more seams/leaks).
3.4 lb/sq yd self-furring diamond mesh; stapled not less than 3 strands, 6" spacing.
Setting-type (hot mud): 20-90 min; pre-mixed: 12-24 hours per coat depending on humidity/thickness.
2-6 typical; consistent team, background-checked, uniformed.
Install casing bead, back-wrap flashing, ensure lath continuous, caulk joints.
Possible but not ideal—cold affects shingle sealing. Best in warm, dry seasons (spring-fall). Emergency installs ok anytime with proper prep.
$1.50-3/sq ft labor; materials $0.50-1/sq ft; full room $500-1500 average.
No, if installed correctly over shingles; manufacturer guidelines followed.
Apply roofing cement under lifted shingles; use peel-and-stick ice/water shield patches; tarp large areas secured with 1x3 boards screwed down.
Verify contractor's license, $1M+ liability/workers comp; proof on request.
Apply mesh patch, 3 thin mud layers feathering wide, sand smooth after full dry.
Measure/cut sheets, hang perpendicular to studs starting from corners/ceiling, screw every 12-16" into framing, tape/mud joints, sand smooth.
Yes—structural exterior; building dept approves lath inspection before coats.
Stucco is a cement-based plaster applied in 3 coats (scratch, brown, finish) over metal lath for durable exterior finish; total 7/8-1 inch thick.
Yes—bring chip/sample or use color match scanner at paint store.
Yes, 24/7 emergency roof repair for leaks or storm damage.
Re-flash with step flashing/base sheets, bend new counterflashing into chase; silicone seal cracks.
Synthetic or ice/water shield; high-temp for steep pitches/valleys.
Snap/rivet new matching material, silicone seal edges.
Metal/plastic bead with mesh flanges, mud over both sides alternately.
Drywall lift/jack, screw gun, utility knife, T-square, rasp, joint compound, tape, mud trays/knives (6-12"), sandpaper/pole sander.